Marin fee waivers expire Dec 31, 2026 Two detached ADUs per lot from Jan 1, 2027 Check your lot before both clocks run

Two Backyard Homes on One Marin Lot: What Changes on January 1, 2027

A second backyard cottage — one for a parent, one to rent — has not been a by-right option on a Marin single-family lot. From January 1, 2027 it will be. Here is what the law gives, what it takes back, and which Marin lots can really carry it.

The short answer

From January 1, 2027, a Marin single-family lot will be able to have two detached new-construction ADUs by right — each up to 800 sq ft, with 4-ft side and rear setbacks.

That is state law (AB 956), and it will apply in every Marin town and in the unincorporated county. It is a future right: nothing below is in force until January 1, 2027.

The numbers and clocks that matter in Marin:

  • Planning range for two detached ADUs: $550k–$900k — Marin County, as of Nov 2026. A planning range, an estimate, not a bid. One detached one-bedroom is $300k–$500k.
  • The trade: build two detached ADUs and your town is not required to also approve a junior ADU (JADU) inside the house.
  • The fee change: from 2027, impact fees on an ADU over 750 sq ft will be charged only on the area above 750 sq ft — an 800 sq ft unit pays on 50 sq ft.
  • The clock that runs out first: unincorporated Marin's fee waiver — up to $2,500 per ADU — ends December 31, 2026, one day before the two-ADU right begins.
  • The Marin reality: slope, septic and fire zone decide whether two buildings fit. The law does not.

Sources, as of November 2026: AB 956 (Chapter 791, Statutes of 2026) and SB 1117 (Chapter 809, Statutes of 2026), chaptered texts, amending Government Code §66323(a)(2); ADU Build Works Marin planning ranges, as of Nov 2026 (estimates, not bids); Marin County fee-waiver programme, marincounty.gov, checked Nov 2026; Mill Valley Municipal Code Ch. 20.90; San Rafael Municipal Code §14.16.285 (Ordinance 2002). Dated November 2026; re-verification scheduled December 28, 2026.

Check this for your address — free

Type your address and tap twice. You see your verdict on screen before we ask for any contact details.

No phone number needed. No builders are signed to our roster yet — we tell you that before you save anything.

Before and after

2026 vs. 2027 on a Marin single-family lot

QuestionThrough Dec 31, 2026From Jan 1, 2027
Detached new-construction ADUsOneTwo, by right
Size and setbacks for those unitsCurrent state and town rulesEach up to 800 sq ft; 4-ft side and rear setbacks
JADU alongside themTwo-detached option does not exist yetTown not required to also approve a JADU
Impact fees on an ADU over 750 sq ftCharged on the unitCharged only on the area above 750 sq ft, up to two ADUs per lot (SB 1117)
HOA restrictionsAs they standAn association will not be able to unreasonably restrict ADUs on lots zoned to allow single-family use
County fee waiver (unincorporated Marin only)Open through Dec 31, 2026Closed, unless the Board of Supervisors extends it

This is a summary of a law change. It is not a finding about your parcel.

The trade-off

Two detached ADUs replace the JADU path — they do not stack on it

The headline version is "three extra homes". The law does not say that. If two detached ADUs are built on the lot, the town is not required to also approve a JADU there.

So the real choice in Marin looks like this:

OptionWhat you buildMarin planning range (Nov 2026 — estimates, not bids)Who it suits
A. Two detached ADUs (from 2027)Two separate backyard homes, up to 800 sq ft each$550k–$900kTwo independent households — a parent and a tenant, or two adult children
B. One detached ADU + a JADU (available now)One backyard home, plus a unit of up to 500 sq ft inside the house$300k–$500k for the detached one-bedroom, plus $80k–$180k for the JADUOne household across the yard, one under your roof — and a much smaller budget
C. One detached ADU (available now)One backyard home$300k–$500kMost Marin lots, most budgets

Option B is not a consolation prize. On a sloped lot where a second foundation is the expensive part, a JADU inside the existing house can be the second unit that actually gets built. Do not budget, promise family, or plan rent on a combination the town is not required to approve.

More on the smaller unit: junior ADUs, explained.

Will it fit

The Marin question: can your lot physically carry two?

Two 800 sq ft buildings, 4-ft setbacks on the sides and rear, and room left to live in. In much of Marin the lot decides before the law does.

Slope. A second detached unit means a second foundation. On a hillside that can mean a second set of engineered footings, retaining and drainage — the main reason a Marin project lands at the top of its range. In Mill Valley, a 2026 staff report shows what happens when a design leaves the standard envelope: a proposed 1,096 sq ft ADU at 19 ft 11 in needed exceptions on size, floor area and height and went to a public hearing (case PL25-0096, June 23, 2026). Two by-right units at 800 sq ft each avoid that path only if they stay inside the envelope.

Septic. Much of unincorporated Marin is on septic. Two added homes are two more households on the system. Capacity, and where the leach field sits, can decide the question before any drawing is made. Get the septic answer for your address first.

Fire zone. In a high fire-severity zone, both units are built to Chapter 7A wildfire standards. That shapes materials and budget for each building.

Access and utilities. Two units need two utility runs and construction access to the back of the lot. A long, narrow or flag lot can be legal for two and impractical for two.

Where two is realistic: flat, deep, sewer-connected lots with clear access to the rear. Where it usually is not: steep hillside lots, small in-town lots, and septic lots already near capacity. We cannot promise either way from a page. The check at the bottom sorts your address into one group or the other as a first screen.

Town by town

The local layer — what we have verified, and what we have not

State law sets the two-unit right. Your jurisdiction still runs the permit. As of November 2026, we have not located a Marin town or county ordinance updated for AB 956 — local codes and handouts still describe one detached ADU. The state right takes effect on January 1, 2027 regardless; expect local paperwork to lag behind it.

Mill Valley

  • The city's ministerial class already matches the AB 956 envelope: a new ADU of 800 sq ft or less, 16 ft or less, with 4-ft side and rear setbacks is approved without design review. Above that, design review applies — the general cap is 1,000 sq ft, or 850 sq ft for a studio or one-bedroom.
  • Ordinance status: the state housing department (HCD) told the city on April 9, 2025 that its ADU ordinance (Ordinance 1330) is not compliant with state ADU law, and noted the city's stated intent to process ADU applications under state law instead. Read as of Nov 5, 2026.
  • Deed restriction — two layers, both true today. The city requires a recorded deed restriction for an ADU in practice. HCD's position is that state law does not allow a city to require one for an ADU. (A JADU is different: state law itself requires a deed restriction.) Ask the city in writing which it will apply to your application.
  • Permit wait on the record: a median of 186 days from application to issuance, across 12 standalone ADU permits. Fees on the record: a median of $17,812.56 in total recorded fees on those 12 permits — per unit permitted, not per lot.
  • Guide: Mill Valley ADU rules · Mill Valley ADU cost.

San Rafael

  • The ordinance of record (SRMC §14.16.285, Ordinance 2002, adopted December 6, 2021) caps a detached ADU at 1,000 sq ft. The state's 800 sq ft unit is unaffected by local lot-coverage and floor-area limits — and that is the unit AB 956 doubles.
  • Ordinance status: HCD sent the city a Letter of Technical Assistance on February 27, 2026 stating its 2021 ordinance "may be outdated and out of compliance". Read as of Nov 5, 2026.
  • Fees: under 750 sq ft, the city waives a published list of fees — impact fees, general plan maintenance, street maintenance and bedroom taxes. From 2027, SB 1117 changes the impact-fee basis for units over 750 sq ft.
  • Guide: San Rafael ADU rules.

Unincorporated Marin County

  • Your permit is a county permit. Septic and slope are the first two questions on most lots.
  • Permit wait on the record: a median of 205 days from application to issuance, across 189 permits.
  • Fee waiver: up to $2,500 per ADU and $1,500 per JADU through December 31, 2026 — see the next section.
  • Guide: Marin County ADU fee waiver.

Novato, Tiburon, Larkspur, San Anselmo and the other towns

We have not published a verified guide for these towns yet, and we do not fill the gap with guesses. AB 956 applies there as state law. For the local layer, ask the planning counter one question in writing: "How will you process an application for two detached ADUs under Government Code §66323(a)(2) from January 1, 2027?"

Two clocks

The fee waiver ends the day before the two-ADU right begins

If you are in unincorporated Marin, two dates sit side by side:

  • December 31, 2026 — the county fee waiver's window closes. Up to $2,500 per ADU, $1,500 per JADU; an additional $5,000 or $10,000 is reimbursed later for a deed-restricted unit.
  • January 1, 2027 — the two-detached right, and the SB 1117 fee basis, begin.

As published, those windows do not overlap. Two honest unknowns:

  1. What must happen by December 31 is not confirmed. The county's published programme does not say whether the qualifying event is an application, an issued permit or something else. Ask Marin County CDA in writing.
  2. Whether a first ADU started under the waiver can be followed by a second detached unit in 2027 is the County's call. Ask that in the same letter.

If the Board of Supervisors extends the waiver, both answers may change. It extended the programme once, on March 11, 2025. That is not a promise it will again.

Inside an incorporated town, none of this applies: the county waiver was never available there.

Be ready

What to do in 2026

  1. Screen the lot first. Slope, septic or sewer, fire zone, and what is already built. If your lot is a one-unit lot, finding out now saves the design fee on a second building.
  2. Decide the JADU trade on purpose. Option A or Option B above is a family decision before it is a drawing.
  3. Design to the known envelope. 800 sq ft and 4-ft setbacks per unit are fixed in the law now. Design work done against them in 2026 is a head start.
  4. In unincorporated Marin, write to CDA with the two questions above before December.
  5. Price it with the same bid structure for both units — four buckets, your lot's drivers as separate lines. The Marin builders guide has the list.

Questions, answered

Two ADUs in Marin — FAQ

Can I apply for two detached ADUs in Marin now?

No. The right begins January 1, 2027. A 2026 application is processed under 2026 rules.

Does AB 956 apply in my Marin town?

Yes — it is state law for single-family lots, in incorporated towns and the unincorporated county alike. Local ordinances and handouts had not been updated for it as of November 2026.

Can I keep a JADU and add two detached ADUs?

Do not plan on it. If two detached ADUs are built, the town is not required to also approve a JADU.

What will two ADUs cost in Marin?

Our planning range is $550k–$900k for two detached ADUs, as of Nov 2026 — an estimate, not a bid. Slope, septic and fire zone push toward the top. Shared site work softens the second unit; it does not halve it.

Will two units fit on a hillside lot?

Sometimes, and rarely cheaply. Each unit needs its own foundation, and the 800 sq ft / 4-ft-setback envelope still has to sit on buildable ground. Screen the lot before designing two buildings.

Does the county fee waiver cover both units?

The waiver is per ADU and ends December 31, 2026 — before the two-ADU right begins. How the two interact is not published; ask Marin County CDA in writing.

Do the two units each pay impact fees?

Under SB 1117, from 2027, each of up to two ADUs per lot pays impact fees only on its area above 750 sq ft. Two 800 sq ft units pay on 50 sq ft each. Other fees — plan check, permit, utilities, schools — are separate.

Does Mill Valley's deed restriction apply to both?

Open question. The city requires one in practice; the state housing department's position is that it may not for an ADU. Ask the city in writing.

Check your lot

Is yours a two-ADU lot?

Type your address and tap twice. You get a plain-language verdict on screen — what your lot can likely take, the planning range for it, and the flags to check — before we ask for any contact details. If you choose to save your brief, we store it and tell you so. No builders are signed to our roster yet, so no quotes are available today and no builder will contact you.

Check my lot

FREE · FAST VERDICT

Step 1 of 2 — your address, what kind of home it is, and what you want to build. Two taps. That is enough for a first verdict; sharpen it afterwards only if you want to.

Your address is looked up with the US Census geocoder and FEMA flood maps to find your jurisdiction. Nothing about you is stored unless you choose to store your brief after your verdict. Privacy

Sizes in the fast verdict are rule caps for your town. Tell us your lot size afterwards, in “Sharpen your verdict”, and we'll check what your lot can actually hold.

ADU Build Works · Lot planSheet A-1 · Your verdict

Fast verdict — preliminary

Your lot looks workable.

    Confidence: preliminary — inferred from your address and answers, not yet confirmed by a site check or a municipal record pull. Nothing here is a permit approval or a guarantee.

    Save your brief

    Four quick things: your name, how to reach you, whether the home is yours, and your OK to contact you. Nothing is stored until you tap the button. Your verdict stays on this page either way — the full plan is just below.

    Roster status, plainly: our founding roster is enrolling and no contractors are signed yet. Early projects are first in line for matching when seats fill — you may then receive up to 2–3 comparable quotes and choose. No quotes are available today, and we will not pretend otherwise.

    View rules: The 2027 view re-reads every row under the rules that start Jan 1, 2027 — rows that change are badged.

    Every type, answered — not just the one you picked

    True cost — the planning band, the fees on record, and what the band leaves out

    Not in the band — budget these separately; no honest source lets us put a number on them for your lot, so none is invented:

      How long until someone can move in?

      Dates that change this decision

        What the permit record shows

        What would change this answer

        Lay your quotes side by side

        Print this sheet and write each contractor's figures in a column. Every row is something a comparable bid has to state; a blank in a quote is a question for that contractor, not a saving. The first column is your brief, filled from your answers.

        Line every quote must stateYour briefQuote AQuote BQuote C

        Check each contractor's licence number on the Contractors State License Board's public lookup (cslb.ca.gov) before you compare prices. Figures in your brief are the rule caps and planning estimates shown above, not bids.

        Make your verdict more exact (optional)

        All of these are optional. Answer any you know and your verdict above updates straight away. You can skip every one of them.

        Skip these — save my brief ↑

        Check my lot — free