California ADU Law Changes for 2027: What Changes, What Ends, What Stays
Three dates decide most of it. One has to do with a second backyard home, one with fees, and one with a Marin deadline that closes the day before the new law opens.
The short answer
From January 1, 2027, a California single-family lot will be able to have two detached ADUs by right — and impact fees on a larger ADU will be charged only on the floor area above 750 sq ft.
That is the headline. Here is the calendar around it:
| Date | What happens | Who it touches |
|---|---|---|
| Dec 5, 2026 | San Francisco Ordinance 234-26 takes effect: lower minimum ceiling heights for habitable space in existing buildings (7 ft habitable; 6 ft 8 in for other rooms). | San Francisco basement and lower-level conversions |
| Dec 31, 2026 | Marin County's ADU fee waiver ends — up to $2,500 per ADU and $1,500 per JADU, more if deed-restricted. | Unincorporated Marin only |
| Jan 1, 2027 | AB 956: two detached new-construction ADUs by right on a single-family lot, each up to 800 sq ft, with 4-ft side and rear setbacks. | Single-family lots statewide |
| Jan 1, 2027 | SB 1117: impact fees on an ADU over 750 sq ft are charged only on the area above 750 sq ft — for up to two ADUs per lot. | Any ADU over 750 sq ft |
Three things to hold on to:
- Nothing in the 2027 rows is in force yet. Until January 1, 2027, the current rules apply. An application filed in 2026 is a 2026 application.
- The second detached ADU is a trade. If you build two detached ADUs, your city will not be required to also approve a junior ADU (JADU) on the lot.
- A legal right is not a lot that fits. Two 800 sq ft buildings with 4-ft setbacks have to physically fit, and the law does not move a slope, a septic field or a property line.
Sources, as of November 2026: AB 956 (Chapter 791, Statutes of 2026) and SB 1117 (Chapter 809, Statutes of 2026), chaptered texts, amending Government Code §66323(a)(2); San Francisco Ordinance No. 234-26 (Board File 260623); Marin County ADU fee-waiver programme, marincounty.gov, checked Nov 2026; HCD ADU Handbook (March 2026 edition) for the state floor. This page is dated November 2026 and will be re-verified on December 28, 2026.
Before and after
Today vs. January 1, 2027
| Question | Through Dec 31, 2026 | From Jan 1, 2027 |
|---|---|---|
| Detached new-construction ADUs on a single-family lot | One | Two, by right (Gov. Code §66323(a)(2) as amended by AB 956) |
| Size and setbacks for those detached units | Current state and local rules | Each up to 800 sq ft, 4-ft side and rear setbacks |
| A JADU alongside two detached ADUs | The two-detached option does not exist yet | The city is not required to also approve a JADU |
| HOA restrictions | Existing rules as they stand | The bar expands: an association will not be able to unreasonably restrict ADUs on lots zoned to allow single-family use (Civil Code §§4751/714.3 as amended) |
| Impact fees, ADU under 750 sq ft | Exempt under state law | Exempt — no change |
| Impact fees, ADU over 750 sq ft | Charged on the unit | Charged only on the area above 750 sq ft, up to two ADUs per lot (SB 1117) |
| Marin County fee waiver (unincorporated only) | Open through Dec 31, 2026 | Closed, unless the Board of Supervisors extends it |
AB 956
Two detached ADUs: what the law does and does not do
What it does. From January 1, 2027, a single-family lot may have two detached, new-construction ADUs by right. Each may be up to 800 sq ft, placed with 4-ft side and rear setbacks. The picture is the main house plus two separate backyard buildings.
What it trades. If two detached ADUs are built, the city is not required to also approve a JADU on that lot. So the real choice is not "two detached plus a junior unit". It is two detached homes, or a combination that keeps a JADU. Decide that on purpose, before drawings lock it in. The junior ADU guide covers what a JADU is and when it is the better unit.
What it does not do.
- It does not make two buildings fit. On a narrow, shallow, steep or septic-constrained lot, the arithmetic of the lot is still the blocker.
- It does not apply to conversions. The right is for two detached, new-construction units.
- It does not rewrite your town's published guidance on the day. As of November 2026, San Francisco Planning's Director's Bulletin No. 3 still states the one-detached rule, and Marin towns' ordinances pre-date the change. State law takes effect regardless — but expect local handouts to lag, and check the date on anything you are quoted.
The planning number. For Marin County, our planning range for two detached ADUs is $550k–$900k (as of Nov 2026 — a planning range, an estimate, not a bid). Shared site work softens the second unit's cost; it does not halve it. We publish no San Francisco-wide range, and Marin figures do not apply to San Francisco.
Local detail: two ADUs in Marin from 2027 · two detached ADUs in San Francisco from 2027.
SB 1117
The fee change, in square feet
From 2027, impact fees on an ADU over 750 sq ft will be charged only on the floor area above 750 sq ft, for up to two ADUs per lot.
- An 800 sq ft ADU will pay impact fees on 50 sq ft.
- A 760 sq ft ADU will pay on 10 sq ft.
- An ADU at or under 750 sq ft has nothing above the line for this to apply to — and an ADU under 750 sq ft is already exempt from impact fees under current state law.
We are not turning that into a dollar figure. Impact fees are set by each city, county and district, and a tidy example number would be invented. Two honest cautions instead:
- Impact fees are one category. Plan-check, permit, utility-connection and school fees are separate, and this law does not remove them.
- The size decision changes. Today, staying under 750 sq ft is often the most valuable measurement in an ADU design. From 2027, going to 800 sq ft will cost impact fees on 50 sq ft rather than on the whole unit. If you are designing now for a 2027 application, design to the 2027 rule.
What ends
December 31, 2026: Marin County's fee waiver
If your property is in unincorporated Marin County, the county waives up to $2,500 per ADU and $1,500 per JADU, with an additional $5,000 (moderate-income) or $10,000 (low-income) reimbursed later if you record a deed restriction. The programme window runs through December 31, 2026.
Two things to know before you plan around it:
- Scope. It does not apply inside an incorporated town. A Mill Valley or San Rafael address is not in the programme — and a town name in your mailing address does not settle which side of the line you are on.
- The deadline's trigger is not confirmed. The county's published programme states the amounts, the tiers and the end date. It does not state which event must happen by December 31 — an application, an issued permit, or something else. Ask Marin County CDA in writing before you rely on it.
Note the sequence: the waiver's window closes on December 31, 2026, and the two-detached right opens on January 1, 2027. As published, the two do not overlap. Whether a first ADU started under the waiver can be followed by a second detached unit in 2027 is a question for the County, not for a web page.
Full detail: Marin County ADU fee waiver.
Already in force
Changes you may have missed that are already law
JADU owner-occupancy (since January 1, 2026). State law now requires owner-occupancy for a JADU only where the JADU shares a bathroom with the main home. A JADU with its own bathroom does not carry that requirement. A recorded deed restriction is still required for every JADU.
Selling an ADU separately (AB 1033). Only where a city has opted in. San Francisco has — under Ordinance 113-25, effective August 10, 2025 — with a strict test: the ADU application was submitted on or after May 1, 2025; it was permitted under the state programme (Planning Code §207.2); the lot has four units or fewer; one ADU per lot; and JADUs are excluded. See selling a San Francisco ADU separately.
San Francisco ceiling heights (from December 5, 2026). Ordinance 234-26 lowers the Housing Code minimum in existing buildings to 7 ft for habitable rooms and 6 ft 8 in for other rooms. For many San Francisco basements and garage levels, that is the difference between excavating and not. See San Francisco basement conversions.
What stays
What 2027 does not change
- The 800 sq ft unit. State law already guarantees a detached ADU of up to 800 sq ft with 4-ft side and rear setbacks, regardless of local lot-coverage, floor-area or open-space limits. That stays. AB 956 adds a second one.
- The 60-day decision clock. A complete ADU application still gets a ministerial decision on the state's 60-day clock. (The calendar from first application to issued permit has run longer in practice, because corrections and resubmittals sit outside that clock: Marin permit records show a median of 186 days from application to issuance in Mill Valley across 12 permits, and 205 days in unincorporated Marin across 189.)
- No short-term rentals. An ADU or JADU may not be rented for under 30 days.
- JADU size. A JADU is up to 500 sq ft, inside the single-family home.
- Your town's own layer. Size caps above 800 sq ft, design review above the ministerial class, and local fee schedules are still local. Mill Valley's general cap is 1,000 sq ft; San Rafael's detached cap is 1,000 sq ft under Ordinance 2002.
Money, honestly
One programme people still search for is closed
The CalHFA ADU Grant Program is closed. People still search for a 2026 round; as of November 2026 there is not one open. If a lender or builder offers to "get you the CalHFA grant", ask them to show you the open application on calhfa.ca.gov.
What is real in 2026–2027: the under-750 sq ft impact-fee exemption (now), the SB 1117 change (from January 1, 2027), and — in unincorporated Marin only — the county waiver (through December 31, 2026).
Be ready
What to do before January 1
- Find out what your lot can take today. The 2027 right adds a second detached unit; it does not change whether the first one fits. Run the check below.
- Decide one unit or two — and the JADU trade — on purpose. That is a household decision before it is a design decision.
- If you are in unincorporated Marin, settle the waiver question in writing with Marin County CDA now, not in the last week of December.
- Design to the rule you will apply under. 2026 application, 2026 rules. 2027 application, 800 sq ft and the above-750 fee basis.
- Check the date on everything. City handouts, builder blogs and older guides will describe the one-detached rule for months after it changes.
Questions, answered
California ADU law 2027 — FAQ
Can I apply for two detached ADUs now?
No. The right begins January 1, 2027. You can design, screen your lot and line up a builder in 2026; the application for the second detached unit is a 2027 application.
Does the two-ADU law apply in my city?
AB 956 amends state law for single-family lots. Your city's handout may not reflect it for some time; the state law takes effect on January 1, 2027 regardless. Whether your lot physically fits two units is a separate question.
Can I have two detached ADUs and a JADU?
Do not plan on it. If two detached ADUs are built, the city is not required to also approve a JADU on the lot.
How much will SB 1117 save me?
It depends on your jurisdiction's impact-fee schedule, so we give the mechanics and no dollar example: from 2027, an ADU over 750 sq ft pays impact fees only on the area above 750 sq ft. An 800 sq ft unit pays on 50 sq ft.
Does my HOA still get a say?
From January 1, 2027, an association will not be able to unreasonably restrict ADUs on lots zoned to allow single-family use. How that applies depends on your CC&Rs; have them read against the amended Civil Code sections.
Is the Marin fee waiver being extended?
Not as of November 2026. The current run exists because the Board of Supervisors extended it on March 11, 2025. A past extension is not a promise of another.
Is the CalHFA ADU grant open?
No. It is closed as of November 2026.
Keep going
Related guides
Marin County
Two ADUs in Marin from 2027
The Marin layer: slope, septic, town rules and the waiver clock.
San Francisco
Two detached ADUs in San Francisco from 2027
Which San Francisco lots it fits.
California law
Junior ADUs
The unit the two-detached option trades away.
Marin County
Marin County ADU fee waiver
Ends Dec 31, 2026.
Check your lot
The law is statewide. Your lot is not.
Type your address and tap twice. You get a plain-language verdict on screen — what your lot can likely take, the planning range for it where we publish one, and the flags to check — before we ask for any contact details. If you choose to save your brief, we store it and tell you so. No builders are signed to our roster yet, so no quotes are available today and no builder will contact you.
The checker covers Marin County and San Francisco addresses only.
Check my lot
FREE · FAST VERDICTStep 1 of 2 — your address, what kind of home it is, and what you want to build. Two taps. That is enough for a first verdict; sharpen it afterwards only if you want to.
Stored and confirmed
Anything wrong in that summary? Email us at [email protected] and we'll correct the record.
We already have this brief from you
If something changed — a different project, a new budget — email us at [email protected] and we'll update the record. Your verdict itself is above, and it stays yours.
That didn't go through — nothing was sent
Your verdict is right here on this page, and it stays yours. Prefer to do this by email? Write to us at [email protected] with your address and what you'd like to build, and we'll set it up with you — no dead end.
Every type, answered — not just the one you picked
True cost — the planning band, the fees on record, and what the band leaves out
Not in the band — budget these separately; no honest source lets us put a number on them for your lot, so none is invented:
How long until someone can move in?
Dates that change this decision
What the permit record shows
What would change this answer
Lay your quotes side by side
Print this sheet and write each contractor's figures in a column. Every row is something a comparable bid has to state; a blank in a quote is a question for that contractor, not a saving. The first column is your brief, filled from your answers.
| Line every quote must state | Your brief | Quote A | Quote B | Quote C |
|---|
Check each contractor's licence number on the Contractors State License Board's public lookup (cslb.ca.gov) before you compare prices. Figures in your brief are the rule caps and planning estimates shown above, not bids.
Make your verdict more exact (optional)
Skip these — save my brief ↑San Francisco screening — two questions that decide an SF project
In San Francisco, space a tenant uses can be a protected “housing service” — it changes what’s allowed, so we ask now, not later. Why this matters →