If what you want is an in-law suite — a private place for a parent, a grown child or a carer, without building in the yard — California has a legal name for it. It is called a junior ADU, or JADU, and it is the smallest and usually the lowest-cost way to add a home to your property.
The short answer
A junior ADU is a separate home of up to 500 sq ft created inside the walls of a single-family house.
It is not a small backyard cottage. It is part of your existing house — a converted bedroom wing, an attached garage, a lower level — set up to be lived in separately.
What to know before anything else:
- Size: up to 500 sq ft, inside a single-family home.
- Marin planning range: $80k–$180k, as of Nov 2026. A planning range, an estimate, not a bid. It is the lowest range of the six ADU types we publish for Marin. We publish no San Francisco range for a JADU.
- A deed restriction is required — by state law, in every town. This is different from a full ADU.
- You may have to live on the property. Since January 1, 2026, owner-occupancy is required only where the JADU shares a bathroom with the main house.
- No short-term rental. A JADU cannot be rented for less than 30 days.
- Deadline, unincorporated Marin only: the county's fee waiver — up to $1,500 for a JADU — ends December 31, 2026.
- 2027 trade-off: from January 1, 2027, a lot that builds two detached ADUs may lose the JADU option.
Sources, as of November 2026: California Government Code §§66333–66339.5 (junior accessory dwelling units), as amended by Stats. 2025, Ch. 507 (AB 1154), effective Jan 1, 2026; ADU Build Works Marin planning ranges, as of Nov 2026 (estimates, not bids); Marin County fee-waiver programme, marincounty.gov, checked Nov 2026; AB 956 (Chapter 791, Statutes of 2026); AB 1033; San Rafael Municipal Code §14.16.286; Mill Valley Municipal Code Ch. 20.90.
The difference
JADU vs. ADU: what you give up and what you get
| Junior ADU (JADU) | ADU | |
|---|---|---|
| Where it is | Inside the single-family house | Detached, attached, above a garage, or converted space |
| Size | Up to 500 sq ft | Larger — the state's by-right detached unit is up to 800 sq ft; town caps vary |
| Bathroom | May share the main house's bathroom | Its own |
| Deed restriction | Required by state law | State housing department's position: a city may not require one |
| Owner must live on site | Only if the JADU shares a bathroom (since Jan 1, 2026) | No |
| Sell it separately as a condo | No — JADUs are excluded from AB 1033 | Possible only where the local programme allows it |
| Marin planning range (Nov 2026 — estimates, not bids) | $80k–$180k | $120k–$220k (garage conversion) to $300k–$500k (detached one-bedroom) |
A JADU has its own entrance from outside and at least an efficiency kitchen. Ask your planning counter what it will accept for each before you draw anything.
The money
What a JADU costs in Marin — and why the range is wide
Our Marin planning range for a JADU is $80k–$180k, as of November 2026. That is an estimate for planning, not a bid, and it is a Marin County figure only.
It is the lowest range we publish because the expensive parts of a new building already exist: foundation, walls, roof, and a utility connection. What moves a JADU from the bottom of the range to the top:
- The bathroom. Sharing the house's bathroom is the low-cost route — and it is also what triggers the owner-occupancy rule. Adding a bathroom costs more and removes that condition.
- The kitchen. New plumbing and electrical runs to a room that never had them.
- The separate entrance. A new exterior door is simple on a ground-floor room and less simple on a hillside lower level.
- What the space was. A finished bedroom wing converts more cheaply than an attached garage that needs insulation, a raised floor and fire separation.
- Hillside and age of house. Older Marin houses can need electrical or structural upgrades once walls are opened.
For every other type and the four cost buckets a bid should show, see ADU cost in Marin County. For the lowest-cost routes ranked, see the cheapest way to build an ADU in Marin.
The fine print
The three conditions that come with a JADU
1. A deed restriction, recorded against your property. State law requires it for every JADU. It runs with the land and tells a future buyer what the unit is. This is the one place the JADU rule is stricter than the ADU rule — for a full ADU, the state housing department's position is that a city may not require a deed restriction at all.
2. Owner-occupancy, in one case. Since January 1, 2026, the owner must live on the property only where the JADU shares a bathroom with the main house. Give the JADU its own bathroom and that condition falls away. If you plan to move and rent out both the house and the unit one day, this decides your bathroom layout now.
3. No rentals shorter than 30 days. A JADU is long-term housing. It is not a short-stay rental.
Where you are
The local layer: Marin and San Francisco
Unincorporated Marin County. The county's fee waiver covers JADUs: up to $1,500 per JADU in county building and planning fees, with no income test, through December 31, 2026. It is applied by staff at permit stage and requires your affirmation that the unit will not be a short-term rental. What must happen by December 31 — an application, an issued permit, or something else — is not confirmed in the county's published material; ask Marin County CDA in writing. The waiver applies only to unincorporated addresses. A postal address that says "Mill Valley" or "San Rafael" can still be unincorporated — check before you assume either way. Details: Marin ADU fee waiver.
Mill Valley. A JADU of up to 500 sq ft inside the home, with the state-law deed restriction. The city's own ADU ordinance is under a state non-compliance finding (HCD letter, April 9, 2025) and the city has said it will process ADU applications under state law. Guide: Mill Valley ADU rules.
San Rafael. JADUs are covered by Municipal Code §14.16.286: up to 500 sq ft. No parking space is required for a JADU. Guide: San Rafael ADU rules.
San Francisco. State JADU law applies. Two things to know: a JADU cannot be sold separately under San Francisco's AB 1033 condo programme, and we do not publish a San Francisco JADU cost range. If your San Francisco plan is a garage or lower-level conversion, the fuller unit types are covered in the basement conversion and Sunset District guides.
Other towns. We have not published a verified guide yet and will not guess. State JADU law applies; ask the planning counter for its JADU handout.
From 2027
The 2027 trade-off: two backyard ADUs, or a JADU
From January 1, 2027, AB 956 will let a single-family lot have two detached new-construction ADUs by right. The trade: if two detached ADUs are built, the town is not required to also approve a JADU on that lot.
That makes the JADU decision part of a bigger one:
- One detached ADU + a JADU — available today. One household across the yard, one under your roof.
- Two detached ADUs — from 2027. Two fully separate households, a much larger budget (Marin planning range $550k–$900k, as of Nov 2026 — an estimate, not a bid), and no assurance of a JADU on top.
If you already have, or plan, a JADU, do not assume a second detached unit can be added later. More: two ADUs on one Marin lot from 2027 · all 2027 law changes.
Is it the right one
When a JADU fits — and when it does not
A JADU usually fits when:
- the person moving in is family, and sharing a wall is a feature, not a problem;
- you have a bedroom wing, attached garage or lower level you are not using;
- the yard is steep, small, or taken up by a septic field;
- the budget is closer to the low hundreds of thousands than the mid.
Look at a full ADU instead when:
- you need more than 500 sq ft, or two bedrooms;
- you want a rental with no owner-occupancy condition and no recorded deed restriction;
- you may want to sell the unit separately one day, where that is allowed;
- sound and privacy between the two households matter more than cost.
Questions, answered
Junior ADU FAQ
What is a junior ADU?
A separate home of up to 500 sq ft created inside a single-family house. In everyday terms: a legal in-law unit within your existing walls.
Is a JADU the same as an in-law suite or granny flat?
"In-law suite" and "granny flat" are everyday names, not legal ones. An in-law suite inside the house is usually a JADU in California law. A separate cottage in the yard is an ADU.
How much does a JADU cost?
Our Marin planning range is $80k–$180k, as of Nov 2026 — an estimate, not a bid. We do not publish a range for other areas.
Do I have to live in the house?
Only where the JADU shares a bathroom with the main house (the rule since January 1, 2026). With its own bathroom, no.
Can I rent out a JADU?
Yes, for terms of 30 days or more. Not as a short-term rental.
Can I have both a JADU and an ADU?
Today, one detached ADU plus a JADU is a recognised combination on a single-family lot. From 2027, building two detached ADUs may rule out the JADU.
Can I sell a JADU separately?
No. JADUs are excluded from AB 1033 separate-sale programmes.
Does the Marin fee waiver cover a JADU?
In unincorporated Marin, up to $1,500 per JADU through December 31, 2026. Which step must be completed by that date is not confirmed — ask the County in writing.
Check your lot
Could your house take a JADU — or more?
Type your address and tap twice. You get a plain-language verdict on screen — what your lot can likely take, the planning range for it, and the flags to check — before we ask for any contact details. If you choose to save your brief, we store it and tell you so. No builders are signed to our roster yet, so no quotes are available today and no builder will contact you.
Check my lot
FREE · FAST VERDICTStep 1 of 2 — your address, what kind of home it is, and what you want to build. Two taps. That is enough for a first verdict; sharpen it afterwards only if you want to.
Stored and confirmed
Anything wrong in that summary? Email us at [email protected] and we'll correct the record.
We already have this brief from you
If something changed — a different project, a new budget — email us at [email protected] and we'll update the record. Your verdict itself is above, and it stays yours.
That didn't go through — nothing was sent
Your verdict is right here on this page, and it stays yours. Prefer to do this by email? Write to us at [email protected] with your address and what you'd like to build, and we'll set it up with you — no dead end.
Every type, answered — not just the one you picked
True cost — the planning band, the fees on record, and what the band leaves out
Not in the band — budget these separately; no honest source lets us put a number on them for your lot, so none is invented:
How long until someone can move in?
Dates that change this decision
What the permit record shows
What would change this answer
Lay your quotes side by side
Print this sheet and write each contractor's figures in a column. Every row is something a comparable bid has to state; a blank in a quote is a question for that contractor, not a saving. The first column is your brief, filled from your answers.
| Line every quote must state | Your brief | Quote A | Quote B | Quote C |
|---|
Check each contractor's licence number on the Contractors State License Board's public lookup (cslb.ca.gov) before you compare prices. Figures in your brief are the rule caps and planning estimates shown above, not bids.
Make your verdict more exact (optional)
Skip these — save my brief ↑San Francisco screening — two questions that decide an SF project
In San Francisco, space a tenant uses can be a protected “housing service” — it changes what’s allowed, so we ask now, not later. Why this matters →
The checker covers Marin County and San Francisco addresses only.